Skip to content

Past projects

Work we have done

Photographs from our own jobs โ€” jetting, inspection, reservoir and tank cleaning, and pump work across the Free State. Tap any one to enlarge it.

Kgotsong, Free State March 2025 Sewer line surveyed by our own crawler. The recorded distance runs from 14.92 m to 24.05 m in this stretch.
Clover, manhole 2 to manhole 3 October 2024 Concrete line recorded end to end. The change of section is on the record at 5.61 m.
Paul Kruger, Clover August 2026 Build-up along the wall, located at 6.92 m so a repair can be quoted against a position rather than a guess.
Paul Kruger, Clover August 2026 Silt along the invert at 20.86 m, recorded on the same run.

Need a line cleared, inspected, or a pump on site?

Call Werner directly, or send a WhatsApp with the site and what the line is doing.

083 282 7290 Send a WhatsApp